DISCOVER THE BENEFITS:

DISCOVER THE BENEFITS:

Great Grip Work Gloves [Cut Resistance Level 5]

Professional Working Gloves for Waste Disposal Plants

Status:

Ready to ship

Shipping Terms:

CIP

Lead Time:

35 Days

Delivery Time:

14 to 22 Days

Min. Qty.

1200

Status:

Ready to ship

Shipping Terms:

CIP

Lead Time:

35 Days

Delivery Time:

14 to 22 Days

Min. Qty.

1200

Professional working gloves for waste disposal plants, industry settings and anywhere else where a good grip and protection are required. High cut resistance (grade 5), which makes them perfect for work where you handle sharp edges and objects.

 

 

Product Type: mechanic gloves/work gloves/racing gloves/cycling gloves
Certification EN420, EN388, ANSI
<Palm: Aramid & HPPE palm with PVC reinforced palm patch and finger tips; Touchscreen fingertips
Back: spandex & mesh back
Cuff: hook and loop strips cuff
Color: Grey
Size available: M-XL
Feature: Cut resistant level 5 Palm

 

Professional working gloves for waste disposal plants, industry settings and anywhere else where a good grip and protection are required. High cut resistance (grade 5), which makes them perfect for work where you handle sharp edges and objects.

 

 

Product Type: mechanic gloves/work gloves/racing gloves/cycling gloves
Certification EN420, EN388, ANSI
<Palm: Aramid & HPPE palm with PVC reinforced palm patch and finger tips; Touchscreen fingertips
Back: spandex & mesh back
Cuff: hook and loop strips cuff
Color: Grey
Size available: M-XL
Feature: Cut resistant level 5 Palm

 

We are obsessed with providing you the best developments in supply chain innovation and waste management.

Specifications

Specifications

Condition

New

Material

Aramid & HPPE /spandex

Type

Mechanic Protection Gloves

Effect

Touch Screen Anti-vibration, Full Protection

Size

M, L, XL

Color

Grey

Gender

Unisex

Package & Shipping

Package & Shipping

Selling Units:

1

Price Per Unit:

Log in to see price

Single Package Size

25X15X4.5 cm

Shipping

CIP

Single Gross Weight

0.250kg

Lead Time

35 Days

Package Type

75 pairs per polybag

Delivery Time

14 to 22 Days

Request for Quotation